• Taunton City Hall

    The plan for a newly renovated $27 million dollar Taunton City Hall includes a new four-story rear section that will merge with the front edifice, and a separate municipal council chambers building with a connecting walkway that will sit next to the main structure.

    That standalone building will occupy space that was once occupied by the circa-1870 Leonard Block — a four-story commercial building with a theater and offices that later came to be known simply as the Star Theater.

    A large, new rear addition will be attached to the front building and a separate, smaller building closer to the street will connect to the granite building via a walkway. That single-story building with its basement and attic will be the new home of the Chester A. Martin Municipal Chambers.

    The new City Hall will take a little getting used to for visitors familiar with pre-arson City Hall. The old rear entrance used to lead into basement offices. The new rear entrance will provide access to what will be considered the building’s first floor. The front entrance will retain the original steps leading up to the lobby of what from now on will be considered a second instead of a first floor.

    So what used to be recognized as a three-floor building will be transformed into a bona fide four-story edifice. ¬Two adjacent buildings during the past five years were demolished to open up space for the new construction.

    The new City Hall is scheduled to open in September 2020.

    More Pictures
  • Swansea Public Library


    The scope of this study included evaluating two site locations: the existing library/town hall site, and the existing Town Hall Annex site on Bark Street. Compass Group Architects, LLC (CGA) developed several potential options that included new construction and additions & renovations to the existing library and town hall. The proposed design will involve the relocation of the existing 1899 library to be placed closer to the existing Town Hall so a new addition could connect these two historic structures. The exterior materials of the new construction will carefully blend the two buildings and will pick-up on the color and textures of the existing facades. The interior spaces will bring in lots of natural light with new finishes and materials that will successfully tie the interiors. The existing Swansea Town Hall will undergo extensive exterior and restorations that will bring the building back to its original condition by removing the interior partitions and exposing the existing wood trusses and arches. The project will include replacing all existing mechanical, plumbing, and electrical systems with new energy efficient systems and equipment that will be easy to operate and maintain.

    More Pictures